In 2016, JPR was engaged by the Binghamton Mets to perform an evaluation and design. The deliverables included a Master Plan, 3D modeling, perspective renderings, and a detailed project cost estimate.
Working closely with the team and listening to their needs, JPR developed a program which included:
• Renovated home plate entrance plaza
• An elevated group event deck in right field
• Kids’ fun zone
• Renovated right field entrance
• Relocated center field bullpen
• Batting cage facility located in center field
• Renovated concession stand
• Signage and graphics