The City of Fort Wayne engaged JPR to conduct a corridor study of North Anthony Boulevard to assess the feasibility of incorporating improved pedestrian and bicycle infrastructure.
The study was broken down into three phases: existing conditions analysis, design charrette, and final recommendations. The Existing Conditions Analysis Phase utilized a facilities inventory, traffic pattern and circulation study, transit facilities, and parking analysis. The Design Charrette Phase was a week-long innovative and collaborative design process, and the Final Recommendations Phase took the assessed needs and public input into account to represent the best options for meeting the goals of the project while also continuing to meet the needs of the area.